Reports

Condition Survey Report 2013 Condition Survey Report 2013

Condition Survey Report 2016

 

WORK DONE SINCE 2016 SURVEY – ‘SOLWAY RANGER’ – MOODY 31

  • Antifouling removed, a small number of blisters found, ground out and filled with epoxy filler.
  • Hull below waterline primed and antifouled.
  • Anode replaced.
  • Feathering propeller serviced.
  • Topsides polished.
  • Engine serviced by engineer, fitting new filters, impeller and oil change.
  • Steel fuel tank (corroded) replaced with new plastic tank with sight gauge
  • Guard rails replaced and gates added amidships on both sides.
  • New curtains and matching scatter cushions supplied
  • New battery for domestic supply fitted.
  • Replaced Distress Flares